Is the SEALMINER A4 Pro Hydro profitable?
Bitdeer · 2026 · Hydro-cooled · 680 TH/s · 7,412 W · 10.9 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 05:15:04 UTC
Fee revenue per block
0.0179 BTC (7-day) · 0.0173 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 05:15:04 UTC
Network snapshot
Block 971,354 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the SEALMINER A4 Pro Hydro nets about $12.89/day ($392/month). Simple payback on the $8,699 observed price is about 22.2 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $5.23 | $20.74 | $631 | 13.8 months |
| $0.050/kWh | $8.72 | $17.25 | $525 | 16.6 months |
| $0.060/kWh | $10.46 | $15.51 | $472 | 18.4 months |
| $0.075/kWh | $13.07 | $12.89 | $392 | 22.2 months |
| $0.090/kWh | $15.69 | $10.28 | $313 | 27.8 months |
| $0.120/kWh | $20.92 | $5.05 | $154 | 56.7 months |
Specifications and price
| Manufacturer | Bitdeer |
|---|---|
| Hashrate | 680 TH/s |
| Power | 7,412 W |
| Efficiency | 10.9 J/TH |
| Cooling | Hydro |
| Observed price | $8,699 (reseller asking price) |
| Price per TH | $12.79/TH |
| Est. resale after 24 months | $3,045 |
| Status / channel | New · Reseller |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar hydro-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| Antminer S21 XP+ Hyd | 480 | 11 | $9,120 | $9.02 |
| Antminer S23e U2H | 865 | 10 | $11,699 | $17.77 |
| Antminer S21j XP Hyd | 495 | 12 | $8,415 | $8.42 |
| Antminer S21 XP Hyd | 473 | 12 | $6,899 | $8.05 |
Questions about the SEALMINER A4 Pro Hydro
Is the SEALMINER A4 Pro Hydro profitable?
Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the SEALMINER A4 Pro Hydro nets about $12.89/day ($392/month). Simple payback on the $8,699 observed price is about 22.2 months.
At what Bitcoin price should the SEALMINER A4 Pro Hydro be turned off?
At $0.075/kWh it stops covering its power cost below about $42,025 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $83,574 at the same difficulty.
What electricity price does the SEALMINER A4 Pro Hydro need to be profitable?
Below about $0.149/kWh at today's Bitcoin price and difficulty, falling to about $0.075/kWh after the halving.
How efficient is the SEALMINER A4 Pro Hydro?
10.9 J/TH: 680 TH/s at 7,412 W, hydro-cooled, released 2026.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
