Is the Antminer S23e U2H profitable?
Bitmain · 2026 · Hydro-cooled · 865 TH/s · 8,650 W · 10 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 05:15:04 UTC
Fee revenue per block
0.0179 BTC (7-day) · 0.0173 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 05:15:04 UTC
Network snapshot
Block 971,354 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the Antminer S23e U2H nets about $17.77/day ($541/month). Simple payback on the $11,699 observed price is about 21.6 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $6.10 | $26.93 | $819 | 14.3 months |
| $0.050/kWh | $10.17 | $22.86 | $695 | 16.8 months |
| $0.060/kWh | $12.21 | $20.83 | $633 | 18.5 months |
| $0.075/kWh | $15.26 | $17.77 | $541 | 21.6 months |
| $0.090/kWh | $18.31 | $14.72 | $448 | 26.1 months |
| $0.120/kWh | $24.41 | $8.62 | $262 | 44.6 months |
Specifications and price
| Manufacturer | Bitmain |
|---|---|
| Hashrate | 865 TH/s |
| Power | 8,650 W |
| Efficiency | 10 J/TH |
| Cooling | Hydro |
| Observed price | $11,699 (distributor new) |
| Price per TH | $13.52/TH |
| Est. resale after 24 months | $4,095 |
| Status / channel | New · Distributor |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar hydro-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| Antminer S23 Hyd | 580 | 9.5 | $14,299 | $12.43 |
| SEALMINER A4 Ultra Hydro | 886 | 9.45 | $9,999 | $19.07 |
| SEALMINER A4 Pro Hydro | 680 | 10.9 | $8,699 | $12.89 |
| Antminer S21 XP+ Hyd | 480 | 11 | $9,120 | $9.02 |
Questions about the Antminer S23e U2H
Is the Antminer S23e U2H profitable?
Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the Antminer S23e U2H nets about $17.77/day ($541/month). Simple payback on the $11,699 observed price is about 21.6 months.
At what Bitcoin price should the Antminer S23e U2H be turned off?
At $0.075/kWh it stops covering its power cost below about $38,555 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $76,673 at the same difficulty.
What electricity price does the Antminer S23e U2H need to be profitable?
Below about $0.162/kWh at today's Bitcoin price and difficulty, falling to about $0.082/kWh after the halving.
How efficient is the Antminer S23e U2H?
10 J/TH: 865 TH/s at 8,650 W, hydro-cooled, released 2026.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
