Is the WhatsMiner M60S+ profitable?
MicroBT · 2024 · Air-cooled · 200 TH/s · 3,400 W · 17 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 05:15:04 UTC
Fee revenue per block
0.0179 BTC (7-day) · 0.0173 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 05:15:04 UTC
Network snapshot
Block 971,354 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the WhatsMiner M60S+ nets about $1.64/day ($50/month). Simple payback on the $3,200 observed price is about 64.2 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $2.40 | $5.24 | $159 | 20.1 months |
| $0.050/kWh | $4.00 | $3.64 | $111 | 28.9 months |
| $0.060/kWh | $4.80 | $2.84 | $86 | 37.1 months |
| $0.075/kWh | $6.00 | $1.64 | $50 | 64.2 months |
| $0.090/kWh | $7.20 | $0.44 | $13 | 238.9 months |
| $0.120/kWh | $9.60 | −$1.96 | −$60 | No payback |
Specifications and price
| Manufacturer | MicroBT |
|---|---|
| Hashrate | 200 TH/s |
| Power | 3,400 W |
| Efficiency | 17 J/TH |
| Cooling | Air |
| Observed price | $3,200 (manufacturer direct) |
| Price per TH | $16.00/TH |
| Est. resale after 24 months | $480 |
| Status / channel | New · Manufacturer direct |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar air-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| Avalon A15Pro 221T | 221 | 16.57 | $1,945 | $1.98 |
| SEALMINER A2 | 226 | 16.5 | $2,893 | $2.05 |
| Antminer S21+ | 235 | 16.49 | $2,739 | $2.14 |
| Avalon A15XP 209T | 209 | 17.8 | $1,421 | $1.42 |
Questions about the WhatsMiner M60S+
Is the WhatsMiner M60S+ profitable?
Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the WhatsMiner M60S+ nets about $1.64/day ($50/month). Simple payback on the $3,200 observed price is about 64.2 months.
At what Bitcoin price should the WhatsMiner M60S+ be turned off?
At $0.075/kWh it stops covering its power cost below about $65,544 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $130,344 at the same difficulty.
What electricity price does the WhatsMiner M60S+ need to be profitable?
Below about $0.096/kWh at today's Bitcoin price and difficulty, falling to about $0.048/kWh after the halving.
How efficient is the WhatsMiner M60S+?
17 J/TH: 200 TH/s at 3,400 W, air-cooled, released 2024.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
