Skip to content
Bitcoin Mining Calculators Logo

Is the Antminer S19 XP Hydro 257T profitable?

Bitmain · 2022 · Hydro-cooled · 257 TH/s · 5,346 W · 20.8 J/TH

Saved input sources

Based on network data from Oct 14, 2026, 05:15:04 UTC

Bitcoin price

$83,466 · Hourly price collection (saved snapshot)

Updated Oct 14, 2026, 05:15:04 UTC

Network difficulty

132.72 T · mempool.space (saved snapshot)

Updated Oct 14, 2026, 05:15:04 UTC

Block subsidy

3.125 BTC · Bitcoin protocol

Effective since Apr 20, 2024

Fee revenue per block

0.0179 BTC (7-day) · 0.0173 BTC (24-hour) · mempool.space reward stats (saved snapshot)

Updated Oct 14, 2026, 05:15:04 UTC

Network snapshot

Block 971,354 · 950.0 EH/s (difficulty-implied)

Hashrate derived from current difficulty via mempool.space (saved snapshot)

Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the Antminer S19 XP Hydro 257T nets about $0.38/day ($12/month). Simple payback on the $771 observed price is about 66.0 months.

Net profit / day
$0.38
$12 / month
Revenue / day
$9.81
11758 sats / day
Power / day
$9.43
$0.075/kWh
Simple payback
66.0 months
on $771
Shutdown BTC price
$80,201
today's difficulty
Shutdown after halving
$159,492
≈ Apr 2028 (estimated)
Break-even electricity
$0.078/kWh
today
Break-even after halving
$0.039/kWh
same price & difficulty

Profit by electricity price

ElectricityPower / dayNet profit / dayNet profit / monthSimple payback
$0.030/kWh$3.77$6.04$1844.2 months
$0.050/kWh$6.29$3.53$1077.2 months
$0.060/kWh$7.54$2.27$6911.2 months
$0.075/kWh$9.43$0.38$1266.0 months
$0.090/kWh$11.32−$1.50−$46No payback
$0.120/kWh$15.09−$5.27−$160No payback

Specifications and price

ManufacturerBitmain
Hashrate257 TH/s
Power5,346 W
Efficiency20.8 J/TH
CoolingHydro
Observed price$771 (distributor used)
Price per TH$3.00/TH
Est. resale after 24 months$386
Status / channelUsed · Distributor

Prices are point-in-time observations from September 24, 2026, not quotes.

Similar hydro-cooled machines

MachineTH/sJ/THPriceNet profit / day
WhatsMiner M6337219.9$2,976$1.15
WhatsMiner M63S40818$3,672$2.63
Avalon A1566HA 460T46017.83$3,220$3.10
Avalon A1566HA 500T50016.13$4,000$4.87

Questions about the Antminer S19 XP Hydro 257T

Is the Antminer S19 XP Hydro 257T profitable?

Yes. At $0.075/kWh, BTC at $83,466 and difficulty 132.72 T, the Antminer S19 XP Hydro 257T nets about $0.38/day ($12/month). Simple payback on the $771 observed price is about 66.0 months.

At what Bitcoin price should the Antminer S19 XP Hydro 257T be turned off?

At $0.075/kWh it stops covering its power cost below about $80,201 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $159,492 at the same difficulty.

What electricity price does the Antminer S19 XP Hydro 257T need to be profitable?

Below about $0.078/kWh at today's Bitcoin price and difficulty, falling to about $0.039/kWh after the halving.

How efficient is the Antminer S19 XP Hydro 257T?

20.8 J/TH: 257 TH/s at 5,346 W, hydro-cooled, released 2022.

Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.