Skip to content
Bitcoin Mining Calculators Logo

Hosted Mining Planner

Plan hosted Bitcoin mining: Mine & Hold vs Mine & Sell vs buying BTC, exit-price grid, and a vendor quote check.

14 calculators • Live network data

Financial planning tools for cost analysis and ROI timelines

Saved input sources

Based on network data from Oct 14, 2026, 05:15:04 UTC

Bitcoin price

$83,466 · Hourly price collection (saved snapshot)

Updated Oct 14, 2026, 05:15:04 UTC

Network difficulty

132.72 T · mempool.space (saved snapshot)

Updated Oct 14, 2026, 05:15:04 UTC

Block subsidy

3.125 BTC · Bitcoin protocol

Effective since Apr 20, 2024

Fee revenue per block

0.0179 BTC (7-day) · 0.0173 BTC (24-hour) · mempool.space reward stats (saved snapshot)

Updated Oct 14, 2026, 05:15:04 UTC

Network snapshot

Block 971,354 · 950.0 EH/s (difficulty-implied)

Hashrate derived from current difficulty via mempool.space (saved snapshot)

The link reopens these exact inputs.

Hosted Mining Planner

Plan a hosted mining deal, compare it with simply buying bitcoin, and check a hosting provider’s projection against neutral assumptions.

Miner

Hosting contract

Curtailment (demand-response) rates are cheaper but uptime often runs 70–85% or lower.

Wall power incl. overhead: 34.98 kW

Market assumptions

Saved snapshot
Saved snapshot

≈ 132.72 T

Fee share of block revenue: 0.6%

Hosting fees stop while paused.

BTC / month (avg)

₿ 0.0282

Total BTC mined

₿ 0.6767

Up-front cash

$83,530

Hosting & fees (total)

$36,935

Exit BTC price

$83,466

Mine & Sell NPV

-$56,917

Strategy comparison

Cash spent in every strategy: $118,465. Mining strategies add $8,103 hardware resale.

Mine & Hold

Keep all mined BTC, value at exit price

-$53,878

−45.5%

Mine & Sell

Sell each month’s BTC at that month’s price

-$53,878

−45.5%

Buy (day one)

Same cash buys ₿ 1.4193 today

$0

0.0%

Buy (monthly)

Hardware cash today, fees each month: ₿ 1.4193

$0

0.0%

Months where revenue is below power cost are shown as paused.

Exit price scenarios

Each row assumes BTC moves smoothly from today’s price to the exit price over the contract. Net profit after all cash spent.

ExitBTC priceMine & HoldMine & SellBuy day oneBuy monthly
0.5×$41,733-$78,724-$63,649-$54,103-$51,486
0.75×$62,600-$67,999-$58,924-$29,616-$26,586
1×$83,466-$53,878-$53,878$0$0
1.5×$125,199-$25,636-$45,491$59,232$52,006
2×$166,932$5,155-$37,347$130,776$104,362
2.5×$208,665$37,112-$28,342$196,164$155,215
3×$250,398$69,069-$20,008$261,552$205,533

Assumptions, in plain terms

  • BTC price growth: 0.00%/month = 0.0%/year
  • Difficulty growth: 2.00%/month = 26.8%/year
  • Post-halving difficulty change: 0.0% (from month 19, block reward halves)
  • Uptime: 98% · Hosting: $0.078/kWh + 2% pool fee + $10/unit/month

Mine & Sell pays back only if BTC grows at least 108.2%/year — that is, faster than difficulty by 64.1%/year.

Mine & Hold pays back only if BTC reaches $160,200 by the end, which means growing 38.5%/year (9.2%/year faster than difficulty).

Mining vs. buying: for the same cash, mining yields ₿ 0.6767 while buying today gets ₿ 1.4193 — 52.3% less bitcoin. A higher BTC price does not fix this: it raises the value of both piles equally, and only the hardware resale narrows the gap.

Type in the assumptions behind a hosting provider’s projection. Hardware and fees come from your inputs above.

How it works

Monthly BTC = (fleet hashrate ÷ network hashrate) × 144 blocks × block reward × 30.42 days × uptime × (1 − pool fee), using the same engine as the Fleet ROI calculator. The block reward halves in April 2028.

Mine & Hold = total BTC × exit price − cash spent + resale. Mine & Sell = Σ (monthly BTC × that month’s price) − cash spent + resale. Buy strategies spend the identical cash on BTC, either all on day one or with hardware cash on day one and each month’s fees that month.

Price growth defaults to 0% so the result shows what mining earns by itself. A sustained post-halving difficulty drop is a sales assumption, not a forecast.

Bitcoin Mining FAQ